Aberdeen Harbour Operations Centre
Client: Aberdeen Harbour Authority
Architect: Parr Partnership
Contractor: Sir Robert McAlpine
The exposed location of this project at the entrance to Aberdeen Harbour set challenges for Henshaw with regards to the extreme weather conditions.
Henshaw designed and installed the £700,000 facetted and sloping curtainwalling to successfully meet the exacting weather, acoustic and solar performance specification.
For clarity of vision, and low reflection, the observation level was glazed with Amiran™ glass.

